IMPORTANT CIVIL ENGINEERING INFORMATION TO BE KEPT FOR RECORD

IMPORTANT CIVIL ENGINEERING INFORMATION TO BE KEPT FOR RECORD

Important Civil Engg Information to be kept for Record.:
1 Gunta = 121 Sq yards.
1 Gunta = 101.171 Sq Meter.
1 Gaj = 1 Yard
1 Yard = 36 inch
1 Yard = 3 feet
1 Yard = 0.9144 meter =
1 mtr.
1 sq Yard = 0.83612 Sq meter.
1 sq Yard = 9 sq feet.
1 Sq yard = 1296 Sq inch.
1 Meter = 1.0936 Yards.
1 Meter = 39.370 inch.
1 Meter = 3.280 feet.
1 Sq meter = 1.1959 Sq yard.
1 Sq meter = 1550 Sq inch.
1 Sq Meter = 10.763 Sq feet.
1 feet = 0.304 meter.
1 feet = 0.333 yards.
1 feet =12 inch
1 Sq feet = 0.111 Sq Yard.
1 Sq feet = 0.09290 Sq Meter.
1 Sq feet = 144 Sq inch.
1 inch = 2.54 cm.
1 Inch = 0.0254 meter.
1 Inch = 0.0277 yards.
1 Inch = 0.0833 feet.
1 Sq Inch = 0.00064516 Sq Meter.
1 Sq Inch = 0.00077160 Sq Yards.
1 Sq Inch = 0.00694444 Sq feet.
1 Acre = 4046.86 Sq Meter.
1 Acre = 4840 Sq yards.
1 Acre = 43560 Sq feet.
CONCRETE GRADE:
M5 = 1:4:8
M10= 1:3:6
M15= 1:2:4
M20= 1:1.5:3
M25= 1:1:2
CLEAR COVER TO MAIN REINFORCEMENT:
1.FOOTINGS : 50 mm
2.RAFT FOUNDATION.TOP : 50 mm
3.RAFT FOUNDATION.BOTTOM/SIDES : 75 mm
4.STRAP BEAM : 50 mm
5.GRADE SLAB : 20 mm
6.COLUMN : 40 mm
7.SHEAR WALL : 25 mm
8.BEAMS : 25 mm
9.SLABS : 15 mm
10.FLAT SLAB : 20 mm
11.STAIRCASE : 15 mm
12.RET. WALL : 20/ 25 mm on earth
13.WATER RETAINING STRUCTURES :
20/30 mm
WEIGHT OF ROD PER METER LENGTH:DIA WEIGHT PER METER
6mm = 0.222Kg
8mm = 0.395 Kg
10mm = 0.616 Kg
12mm = 0.888 Kg
16mm = 1.578 Kg
20mm = 2.466 Kg
25mm = 3.853 Kg
32mm = 6.313 Kg
40mm = 9.865 Kg
1bag cement-50kg
1feet-0.3048m
1m-3.28ft
1sq.m-10.76sq.f ¬t
1cu.m-35.28cu.f ¬t
1acre-43560sq.f ¬t
1cent-435.6sq.f ¬t
1hectare-2.47ac ¬re
1acre-100cent-4 ¬046.724sq.m
1ground-2400sq. ¬ft
1unit-100cu.ft- ¬2.83cu.m
1square-100sq.f ¬t
1 M LENGTH STEEL ROD I ITS VOLUME
V=(Pi/4)*Dia x DiaX L=(3.14/4)x D xD X 1 (for 1m length)

Density of Steel=7850 kg/cub meter
Weight = Volume x Density=(3.14/4)xD x D X
1×7850 (if D is in mm ) So =((3.14/4)x D x D X1×7850)/(1000×1000) = D2/162.27
DESIGN MIX:
M10 ( 1 : 3.92 : 5.62)
Cement : 210 Kg/ M 3
20 mm Jelly : 708 Kg/ M 3
12.5 mm Jelly : 472 Kg/ M 3
River sand : 823 Kg/ M 3
Total water : 185 Kg/ M 3
Fresh concrete density: 2398 Kg/M 3
M20 ( 1 : 2.48 : 3.55)
Cement : 320 Kg/ M 3
20 mm Jelly : 683 Kg/ M 3
12.5 mm Jelly : 455 Kg/ M 3
River sand : 794 Kg/ M 3
Total water : 176 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2430 Kg/ M 3
M25 ( 1 : 2.28 : 3.27)
Cement : 340 Kg/ M 3
20 mm Jelly : 667 Kg/ M 3
12.5 mm Jelly : 445 Kg/ M 3
River sand : 775 Kg/ M 3
Total water : 185 Kg/ M 3
Admixture : 0.6%
Fresh concrete density: 2414 Kg/ M 3
Note: sand 775 + 2% moisture,
Water185 -20.5 =164 Liters,
Admixture = 0.5% is 100ml
M30 ( 1 : 2 : 2.87)
Cement : 380 Kg/ M 3
20 mm Jelly : 654 Kg/ M 3
12.5 mm Jelly : 436 Kg/ M 3
River sand : 760 Kg/ M 3
Total water : 187 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2420 Kg/ M 3
Note: Sand = 760 Kg with 2% moisture
(170.80+15.20)
STANDARD CONVERSION FACTORS
INCH = 25.4 MILLIMETRE
FOOT = 0.3048 METRE
YARD = 0.9144 METRE
MILE = 1.6093 KILOMETER
ACRE = 0.4047 HECTARE
POUND = 0.4536 KILOGRAM
DEGREE FARENHEIT X 5/9 – 32 =DEGREE CELSIUS
MILLIMETRE= 0.0394 INCH
METRE = 3.2808FOOT
METRE = 1.0936YARD

MATERIAL CALCULATION:

CEMENT IN BAGS
01. PCC 1:5:10 1440/5*0.45 129.60Kg=2.59
02. PCC 1:4:8(M 7.5) 1440/4*0.45162.00=Kg 3.24
03. PCC 1:2:4(M 15) 1440/2*0.45324.00Kg =6.48
04. PCC 1:3:6(M 10) 1440/3*0.45216.00Kg =4.32
05. RCC 1:2:4(M 15) 144/2*0.45324.00Kg =6.48
06. RCC 1:1.5:3(M 20) 1440/1.5*0.4532.00Kg=8.64
07. RCC 1:1:2(M 25) 370.00Kg =7.40
08. RCC M 30 410.00Kg= 8.20
09. RCC M35 445.00Kg =8.90
10. RCC M40 480.00Kg= 9.60
11. Damp Proof Course
CM1:3,20mm tk 1440/3*0.02210.56Kg= 0.21
12. 2″tk precast slab M15 324*0.0516.20Kg =0.32
13. 3″tk precast slab M15 324*0.07524.30Kg=0.49
14. GC Masonry CM 1:7 1440/7*0.3470.00Kg=1.40
15. Brick Work CM 1:6 1440/6*0.2560.00Kg =1.20
16. Brick Work CM 1:4, 115tk 1440/4*0.25*0.11510.35Kg =0.21
17. Grano Flooring CC 1:1.5:3 1440/1.5*0.45*0.0521.60Kg =0.43
18. Plastering CM 1:3, 12mm tk1440/3*0.0146.72Kg =0.13
19. Wall Plastering CM 1:4,12mm tk 1440/4*0.014 5.00Kg =0.10
20. Laying Pressed Tiles Overa CM 1:4, 20mm tk 1440/4*0.0227.92Kg =0.16
21. Ceramic Tiles, Marble, Granite, Caddapah SlabCM 1:4, 20mm tk 1440/4*0.0227.92Kg= 0.16
22. Hollow Block MasonryCM 1:6, 200mm tk/m¬2¬ 10.00Kg=0.20
SAND CALCULATION (CFT):
01. Any Concrete Work
(PCC, RCC) 0.45*35.315= 20.00
02. Damp Proof Course
CM `1:3, 20mm tk =1.00
03. 2″tk Precast slab M15 =1.00
04. 3″tk Precast slab M15 =1.50
05. SS Masonry in CM 1:7 =15.00
06. Brick Work in CM 1:6= 15.00
07. Brick Work in CM 1:4,115mm tk=2.00
08. Grano Flooring in CC 1:1.5:3 =1.00
09. Plastering in CM 1:3, 12mm tk=1.00
10. Wall Plastering CM 1:4, 12mm tk=1.00
11. Laying Pressed Tiles over a CM1:4, 20mm tk=1.00
12. Ceramic Tiles, Marble, Granite, Cuddapah slabCM 1:4, 20mm tk =1.00
METAL CALCULATION:
01. Any Concrete Work 32.00 cft
02. Grano Flooring in CC 1:1.5:3, 50mm tk 1.60cft
03. Grano Flooring in CC 1:1.5:3,75mm tk 2.40cft
04. Grano Flooring in CC 1:1.5:3,100mm tk 3.20cft
05. Bricks/cum 450.00 Nos
06. Size Stone/ cum 90.00 Nos
07. Rough Stone 10.00 cft
08. Bond Stone/ cum 10.00 Nos
09. Cement Paint/100 Sft 2.00 Kg
10. White Cement/100 Sft 2.00 Kg
11. Janathacem/100 Sft 1.50 Kg
12. Enamel Paint/100 Sft – 2 Coats1.25 Litre
13. Wall Putty/100 Sft 10.00 Kg
14. Plaster of Paris/100 Sft 25.00 Kg
15. Distember/100 Sft 2.00 Kg
16. Cement Primer 0.60 Litre0.40 Litre
17. Weathering CourseLime 12.50 KgBrick bats 32.00 Kg
18. Providing Sand Gravel Mix- CumSand 20.00 CftGravel 40.00 Cft
19.WBM – 75mm tk – 1st Layer – 10SqmMetel(60-40 mm) 35.00 CftGravel 10.00 Cft
20. Pressed Tiles – Sqm 20.00 Nos
21. Hollow Block – 200mm tk 14.00Nos

CONVERSION TABLE:
01. 1 RM 3.28 Rft
02. 1 Sqm 10.76 Sft
03. 1 Cum 35.32 Cft
04. 1 Inch 2.54 cm
05. 1 sft 0.09Sqm
06. 1 Acre 0.04 Hectare
07. 1 Hectare 2.47 Acres
08. 1 Cft 0.028 Cum
09. 1 Feet 12.00 Inch
10. 1 Feet 0.305 M
11. 1 Cum 1000.00 Litre
UNIT WEIGHT:
01. Concrete 25 kN/m3
02. Brick 19 kN/m3
03. Steel 7850 Kg/m3
04. Water 1000 Lt/m3
05. Cement 1440 Kg/m3
06. 1Gallon 4.81 Litres
07. Link 8″ = 200mm
08. 1 Hectare 2.471 acr(10000m2)
09. 1 Acr 4046.82m2 = 100 cent
DEVELOPMENT LENGTH:
01. Compression 38d
02. Tension 47 & 60d
03. 1 Cent 435.60 Sft
04. 1 Meter 3.2808 ft
05. 1 M2 10.76 ft2
06. 1 Feet 0.3048m
07. 1 KN 100Kg
08. 1kN 1000N
09. 1 Ton 1000Kg = 10,000 N = 10 kN
10. 1 kG 9.81N
M5=2.54Bg/m3, M7.5=3.18Bg/m3,
M10=4.32Bg/m3,
M20=8.64Bg/m3, M25=12.9 Bg/m3,
M40=500+100Kg/m3
1m3 Conrete = 0.9 m3 Jelly + 0.55m3 Sand +0.225 m3
BRICK:
Weight = 3.17 – 3.80 Kg
Water absorption 12 to 15%
Compressive strength = 36Kn/cm2
230mm Wall/m3 = 460 Bricks + 20CftSand +66Kg Cement

Abbreviations used in Civil Engineering:

• DPC – Damp proof course.
• RCC – Reinforced cement concrete.
• RBC – Reinforced Brick concrete.
• R.B.W – Reinforced brickwork.
• C.I.Sheet – Corrugated Iron sheet.
• C.I.Pipe – Cast iron pipe.
• NCF – Neat cement finishing.
• SWG – Standard wire gauge.
• MB – Measurement book.
• GP – Ground plane.
• VP – Vertical plane.
• HP – Horizontal plane.
• CP – Cement plaster.
• LC – Lime concrete.
• CC – Cement concrete.
• AC – Asbestos cement.
• CS – Comparative statement.
• PERT – Programme Evaluation and Review Technique.
• CPM – Critical path method.
• CEV – Council of Engineers and Valuers.
• CIAF – CEV Integral Appraisers Foundation.
• USD – Ultimate strength design.
• W.S.D – Working stress design.
• PL – Plinth level.
• GL – Ground level.
• EGL – Existing ground level.
• OGL – Original ground level.
• FGL – Formation ground level.
• HFL – Highest flood level.
• RL – Reduced level.
• A.C.I – American concrete institute.
• A.A.S.H.T.O – American Association of state highway Transport Official.
• A.R.E.A – American Railway engineering association.
• A.S.T.M – American society for testing materials.
• ISI – Indian standard institute.
• W.C – Water closet.
• B.M – Bending moment.
• L.L – Live load.
• D.L – Dead load.
• E.L – Environmental load.
• U.S.C – Ultimate stress of concrete.
• A.S.C – Allowable Stress of concrete.
• F.M – Fineness modulus.
. B.M – Benchmark.
. PVC – Polyvinyl chloride .
. UPVC – Unplasticized Polyvinyl chloride.
. PPR – Poly Propylene Random.

 

FOR ALL UPDATES IN EMPANELMENTS & OTHER UPDATED

GET ALL RELATED NEWS UPDATES IMMEDIATELY BY JOINING THE SOCIAL MEDIA PLATFORMS OF CEV GROP BY CLICKING THE LINK PROVIDED IN THE NEWS

JOIN SOCIAL MEDIA PLATFORMS OF CEV INDIA FOR ALL UPDATES RELATED TO THE PROFESSION

FACEBOOK PAGE CEV INDIA,                 TELEGRAM GROUP,                           YOUTUBE CHANNEL

Disclaimer :

We take all possible care for accurate & authentic news/empanelment/tender information, however, Users are requested to refer Original source of the Notice / Tender Document published by the Issuing Agency before taking any call regarding this tender.

error: Content is protected !!
Scroll to Top