EMPANELMENT IN SOUTH EASTERN RAILWAYS
CONDUCTING FINAL LOCATION SURVEY, TRAFFIC SURVEY, SUBMISSION OF COMPREHENSIVE DPR FOR ALL CIVIL, ELECTRICAL AND S&T WORK, PREPARATION OF DETAIL ESTIMATE ALONG WITH ALIGNMENT PLAN, YARD PLAN, DRAWING FOR MINOR BRIDGES, MAJOR BRIDGES, ROB/RUB, FOB, LEVEL CROSSING DRAWINGS, HYDROLOGICAL & GEOTECHNICAL INVESTIGATION AND ALL OTHER ANCILLARY WORKS FOR (A) FLYOVER AT A-CABIN OF BONDAMUNDA (ITEM NO. 31) (5.0 KM); (B) FLYOVER PADPHAR /DONGOAPOSI DOWN GRID TO DONGOAPOSI 3RD LINE/JOINT LINE (5.0 KM) (ITEM NO. 28); (C) FLYOVER UP GRID OF ADITYAPUR-GAMHARIA SECTION TO BIRARAJPUR (ITEM NO. 28) (5.0 KM); (D) FLYOVER BIRARAJPUR TO KANDRA (CHANDIL) END (ITEM NO. 32) (5.0 KM); (E) BYPASS AT PADAPAHAR (BOLANIKHADAN TO BANSPANI TO DHAMRA PORT) (ITEM NO. 33) (10.0 KM) UNDER THE JURISDICTION OF CPM/GS/CKP OF S.E. RAILWAY
CLICK BELOW TO GET COMPLETE DETAILS
FOR MANY MORE UPDATES AVAILABLE CLICK BELOW
CLICK THE BELOW LINK TO READ THE COMPLETE CONTENTS
SOME CONTENTS OF THIS WEBSITE ARE FOR GOLD SUBSCRIBERS ONLY.
Join us as a GOLD SUBSCRIBER and get access to read important books.
KIND ATTENTION
We are going to close all what’s groups of CEV soon due to difficulties in posting information or message in more than 5 groups of CEV at a time.
All future posts of empanelment notices & professional importance will be shared on
1. https://t.me/+dbHNkNO22xsyYTY1
2. www.valuerworld.com
3. The Twitter handle of CEV India
https://twitter.com/cevindia?t=XbqlvnwUVz1G3uPgs749ww&s=09
after closing the groups.
All members of these groups are requested to register themselves at the following link immediately for Getting all related timely updates