EMPANELMENT IN URBAN INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED
DESIGN AND BUILD TWO NOS SEWAGE TREATMENT PLANT OF INSTALLED CAPACITY 4.5 MLD BEFORE AQUEDUCT AND 4.5 MLD AFTER AQUEDUCT ALONG WITH ALL APPURTENANT STRUCTURES AND ALLIED WORKS CONTROLLED WITH SCADA INCLUDING 460 MTR APPROACH ROAD, SURVEY, REVIEW THE DESIGNS, WHERE NECESSARY, AND BUILDING 1.95 KM INTERCEPTION DRAIN BEFORE AQUEDUCT & 2.1 KM INTERCEPTION DRAIN AFTER AQUEDUCT FOR TAPPING OF 37 DRAINS, INCLUDING SCREENS AND MECHANICALLY OPERATED GATES FACILITATING SURFACE WATER RUNOFF INTO RAMREKHA RIVER, OPERATION AND MAINTENANCE OF THE COMPLETE WORKS OF SEWAGE TREATMENT PLANT, INTERCEPTION & DIVERSION WORKS, AND EFFLUENT CHANNEL FOR A PERIOD OF 15 YEARS
CLICK BELOW TO GET COMPLETE DETAILS
FOR MANY MORE UPDATES AVAILABLE CLICK BELOW
CLICK THE BELOW LINK TO READ THE COMPLETE CONTENTS
SOME CONTENTS OF THIS WEBSITE ARE FOR GOLD SUBSCRIBERS ONLY.
Join us as a GOLD SUBSCRIBER and get access to read important books.
KIND ATTENTION
We are going to close all what’s groups of CEV soon due to difficulties in posting information or message in more than 5 groups of CEV at a time.
All future posts of empanelment notices & professional importance will be shared on
1. https://t.me/+dbHNkNO22xsyYTY1
2. www.valuerworld.com
3. The Twitter handle of CEV India
https://twitter.com/cevindia?t=XbqlvnwUVz1G3uPgs749ww&s=09
after closing the groups.
All members of these groups are requested to register themselves at the following link immediately for Getting all related timely updates