CTN PRESS

CTN PRESS

NEWS & BLOGS EXCLUCIVELY FOR INFORMATION TO ENGINEERS & VALUERS COMMUNITY

REQUIRED ELECTRICAL CONSULTANCY SERVICES IN MINISTRY OF PETROLEUM AND NATURAL GAS

REQUIRED ELECTRICAL CONSULTANCY SERVICES IN MINISTRY OF PETROLEUM AND NATURAL GAS

ELECTRICAL CONSULTANCY SERVICES FOR PROPOSED LOBP PLANT AT RASAYANI (NEAR MUMBAI)-CONSULTANT NEEDS TO COMPLETE THE DESIGN AND PREPARATION OF DRAWING FOR LT ELECTRICAL SYSTEM AS PER BELOW DETAIL – I. PREPARATION OF ENGINEERING DESIGN BASIS II. PREPARE SINGLE LINE DIAGRAM FOR ELECTRICAL SYSTEM III. PREPARE PANEL DRAWINGS , SYSTEM LOGICS ETC. IV. VETTING OF TRANSFORMER AND DG SIZING CALCULATION V. FINALIZATION OF DATASHEETS/ SPECIFICATIONS, QAP’S, ITPS. VI. PREPARATION OF FINAL LOAD LIST. PRELIMINARY LOAD LIST TO BE PROVIDED BY BPCL VII. CARRYING OUT LUX LEVEL CALCULATIONS AS PER OISD 149/OISD 237 THROUGH REPUTED AGENCIES AS APPROVED BY BPCL. PLANT LAYOUT SHALL BE SHARED BY BPCL VIII. PREPARATION OF POWER AND CONTROL CABLE SCHEDULE, MCC TO CONTROL CABLE SCHEDULE AND CONTROL CABLE INTERCONNECTION DETAILS IX. PREPARATION OF EQUIPMENT LAYOUT, CABLE LAYOUT, CABLE TRENCH DRAWINGS, EARTHING LAYOUT, LIGHTING LAYOUT, LIGHTING SCHEDULE ETC. X. PREPARATION OF ELECTRICAL EQUIPMENT SIZING CALCULATION, CABLE SIZING CALCULATION AND RECOMMENDED RELAY SETTINGS XI. MATERIAL SPECIFICATIONS XII. MATERIAL TAKE OFF (MTO), BILL OF MATERIAL (BOM) FOR ALL PROCUREMENT ITEMS XIII. PREPARATION OF BOQ , PREPARATION OF TENDER / MR SPECIFICATIONS XIV. ESTIMATE OF VARIOUS MATERIALS AND PACKAGES PERTAINING TO ELECTRICAL SYSTEM XV. ENGINEERING AND MR PREPARATION FOR FIRE ALARM SYSTEM XVI. DESIGN OF A/C PACKAGE WHEREVER REQUIRED ALONG WITH LOAD CALCULATIONS TECHNICAL SPECIFICATIONS XVII. DESIGN OF LIGHTING AND ASSOCIATED ELECTRICAL FACILITIES INSIDE BUILDING AND SHEDS AND PREPARATION OF LAYOUT XVIII. CARRYING OUT EARTH FAULT CALCULATIONS OF EACH MAJOR FACILITY AND EARTHING LAYOUT XIX. CABLE AND CABLE TRAY LAYOUT XX. CARRYING OUT LUX LEVEL STUDY FOR THE ENTIRE PLANT, SHEDS, OPERATIONAL AREAS, ALL CIVIL BUILDINGS, ROADS, OPERATING PLATFORMS, TANK FARMS, ANY OTHER OPERATIONAL AREA NOT MENTIONED HEREWITH BUT PART OF THE PLANT FACILITIES XXI. CONSULTANT HAS TO DESIGN ERC (ELECTRICAL CABLE ROAD CROSSINGS) & INSTRUMENTATION CABLE ROAD CROSSINGS AT APPROPRIATE LOCATION AS PER THE APPROVAL OF THE ENGINEER IN CHARGE XXII. ANY OTHER ACTIVITY CONSIDERED NECESSARY.

CLICK BELOW TO GET COMPLETE DETAILS

 

 




 

FOR MANY MORE  UPDATES AVAILABLE CLICK BELOW 

CLICK THE BELOW LINK TO READ THE COMPLETE CONTENTS

SOME CONTENTS OF THIS WEBSITE ARE FOR GOLD SUBSCRIBERS ONLY.

Join us as a GOLD SUBSCRIBER and get access to read important books.

CEV LIBRARY GOLD SUBSCRIPTION

KIND ATTENTION
We are going to close all what’s groups of CEV soon due to difficulties in posting information or message in more than 5 groups of CEV at a time.

All future posts of empanelment notices & professional importance will be shared on
1.
https://t.me/+dbHNkNO22xsyYTY1
2.
www.valuerworld.com
3. The Twitter handle of CEV India
https://twitter.com/cevindia?t=XbqlvnwUVz1G3uPgs749ww&s=09
after closing the groups.
All members of these groups are requested to register themselves at the following link immediately for Getting all related timely updates

error: Content is protected !!
Scroll to Top