EMPANELMENT IN SOUTH EASTERN RAILWAYS
CONSULTANCY SERVICES FOR DETAILED PROJECT REPORT AND DETAILED DESIGN CONSULTANCY IN CONNECTION WITH EXECUTION OF WORK FOR PRELIMINARY WORKS SUCH AS FINAL LOCATION SURVEY, SOIL INVESTIGATION WORKS, PREPARATION YARD PLANS, SLOPE STABILITY ANALYSIS AND SUBMISSION OF VARIOUS DETAILED DESIGN & DRAWINGS BETWEEN (I) DANGAOPOSI-JAROLI 3RD LINE (44.10 KM), (II) GAMAHARIA-CHANDIL 3RD LINE (25.50 KM), (III) ADITYPUR-RAJKHARSWAN 4TH LINE (37 KM), (IV) BARBENDRA-DAMRUGHUTU DOUBLING AND DAMRUGHUTU-BOKARO STEEL CITY 3RD LINE (30 KM), (V) RAJKHARSWAN-DANGAOPOSI 4TH LINE (75 KM), (VI) GAMAHARIA-CHANDIL 4TH LINE (25.50 KM), (VII) SINI-KANDRA 3RD LINE & 4TH LINE (27.2 KM), (VIII) DANGOAPOSI-JAROLI 4TH LINE (44.90 KM), (IX) BYPASS LINE BETWEEN NOAMUNDI-JAMKUNDIA AT PADAHAR (5 KM) & (X) BARBILBOLANIKHADAN DOUBLING (3 KM) OF DY CE/CON/ADRA OF S. E. RAILWAY. ESTIMATE NOS. 7/FLSSUR/2022, 8/FLS-SUR/2022, 9/FLS-SUR/2022, 11/FLS-SUR/2022, 12/FLS-SUR/2022, 13/FLS-SUR/2022, 18/FLS-SUR/2022, 19/FLS-SUR/2022, 20/FLS-SUR-2022 & 21/FLSSUR/2022
CLICK BELOW FOR MORE DETAILS
FOR MANY MORE UPDATES AVAILABLE CLICK BELOW
CLICK THE BELOW LINK TO READ THE COMPLETE CONTENTS
SOME CONTENTS OF THIS WEBSITE ARE FOR GOLD SUBSCRIBERS ONLY.
Join us as a GOLD SUBSCRIBER and get access to read important books.
KIND ATTENTION
We are going to close all what’s groups of CEV soon due to difficulties in posting information or message in more than 5 groups of CEV at a time.
All future posts of empanelment notices & professional importance will be shared on
1. https://t.me/+dbHNkNO22xsyYTY1
2. www.valuerworld.com
3. The Twitter handle of CEV India
https://twitter.com/cevindia?t=XbqlvnwUVz1G3uPgs749ww&s=09
after closing the groups.
All members of these groups are requested to register themselves at the following link immediately or Getting all related timely updates.